Thursday, September 18, 2008

Five Weeks of Construction

After what I shall euphemistically call plumbing problems, this is the first full day without construction workers in my house. Serenity at last!

Because of the proximity of tropical storms and hurricanes, the original plan of removing the house contents to a storage unit in the driveway changed to that of moving the house contents from room to room as the flooring was completed. I’ve now experienced the stress and frustration of a complete house move without the fun of a new location at the end of it.

Somehow it’s disorienting to find one’s stove sitting unplugged in the middle of the living room, while the refrigerator hums away in the office. I was forced to have strong words with the contractor about sanitary facilities at the point that I faced the very real possibility of both toilets being out of commission simultaneously. Fortunately the prospect of an infuriated woman deprived of indoor toilets resulted in the desired action and repairs were effected at the last minute.

At the end of it all, I have beautiful new flooring, which will be easier to keep clean. The furniture was rearranged to my satisfaction and the house is eerily tidy, as boxes remain to be unpacked onto the bookshelves. Only time will tell if I can keep things this way.

The sheer bliss of being able to ink several of my favorite pens, open my notebook and sit down to write, uninterrupted, for the first time in over a month, is indescribable.

2 comments:

melter65 said...

I think the builders have learned an invaluable lesson here, that is 'never come between a woman and her two bathrooms'!!

Glad to hear your home is now sorted out and you're writing again, Beth!

Best Wishes, melter65

Anonymous said...

Congratulations, Beth. Weeks without writing sounds scary.